Sewerage Network in Ioannina
Construction of integrated sewage collection and transportation networks in the settlements of Kardamitsia, Exochi (Nea Zoe), Tsiflikopoulo, Drosia – Penteli, K. Neochoropoulo and Seismoplikta. The total length of the proposed internal networks and gravity transportation pipelines is 55,5 km, whereas the length of suction pipelines is 6,57 km. The project also includes the construction of 3,750 private connections.