Construction of a new bridge on the river Arachthos
Construction of a new bridge with a total length of 107,80m on the river Arachthos in the area of Plaka.
The new bridge made of reinforced concrete, is planned to be constructed adjacent of the existing metal bridge “Belay” with a total estimated length of ~ 100m.
The project also includes the construction of new road accesses on both sides of the bridge to be connected to the existing road network with a total length of ~ 350m. The area of interest is located on the borders of the Prefectures of Ioannina and Arta, as well as on the borders of the Municipalities of Central Tzoumerka and North Tzoumerka.