Construction of a new bridge on the river Arachthos

Construction of a new bridge with a total length of 107,80m on the river Arachthos in the area of Plaka.

The new bridge made of reinforced concrete, is planned to be constructed adjacent of the existing metal bridge “Belay” with a total estimated length of ~ 100m.

The project also includes the construction of new road accesses on both sides of the bridge to be connected to the existing road network with a total length of ~ 350m. The area of ​​interest is located on the borders of the Prefectures of Ioannina and Arta, as well as on the borders of the Municipalities of Central Tzoumerka and North Tzoumerka.

Date

2021

Budget

3.900.000,00 €

Type

Road Construction
Services

Creation on a personal level

Design

Design is TEDRA’s commitment to legislation, the rules of art and science, in order for a project to meet the needs of each interested client individually.

Study

The study for TEDRA is synonymous with the accuracy, speed and quality of implementation of each project uniquely. The effective performance of ergonomics leads to the excellent result of construction of the project with accuracy and completeness.

Construction

Each project has special requirements. For TEDRA, each project is a challenge of applying know-how and experience, with the main focus on responsibility in perfect construction.

Maintenance

TEDRA presents and undertakes the implementation of integrated solutions in the field of operation and maintenance of projects, providing guarantees of safety and efficiency through maintenance work.

In the light of the experience and the know-how we focus on the excellence of results by having the best quality. We meet the requirements of each project in order to have an accurate and timely completion of them.