Metal Building Construction for BIZIOS Dairy
TEDRA completed the construction of a metal building with a total area of 765.00 m2 at the facilities of BIZIOS Dairy in Elassona.
For the fire protection of the building, fire resistant paint was applied to the metal frame, as well as 80mm thick stone wool panels, in the covering and the side cover.
The floor of the building is industrial. The building has two industrial doors of dimensions of 3.50×3.50 and a manhole wall. 1,00 x 2,15.
The construction of the building includes the necessary electrical installations (drainage, water supply, electrical installation, and firefighting).